Sixpenny Moon is ready!

Thanks to a huge effort from John, Sixpenny Moon is now ready to go back into the water.  She is being lifted & dropped on Saturday 14th April ready for the new season.

The main jobs completed:

  • Removed old antifoul and rubbed down
  • Two new coats of antifoul applied
  • New sacrificial anodes fixed to bare metal
  • Repairs to dings on the bows and transom; topsides touched up
  • Removed and repaired log impeller/transducer, tested out of water
  • Cleaned topsides with cutting compound and polished after

Leave a Reply

Your email address will not be published. Required fields are marked *